CARLING : Amsterdam2017-12-08T14:42:39+00:00

Project Description

PROJECT
Client  Carling Technologies
Category Shell Scheme
Job specifics Mets Amsterdam, 10m x 8m Shell Scheme, 2.4m tall, 350mm fascia, 3 open sides
Features Its is often more cost effective for a client to choose a shell scheme rather than a space only booth as it will commonly incliude the electrical supply and lighting. Mets have a different approach though by requiring all participants to have a shell therefore levelling the paying field somewhat between the big budget companies and smaller, bespoke suppliers. The Carling technologies modular booth is therefore designed with this in mind, allowing the stand to be reduced in height to fall within the 2.4m tall shell scheme, fit around the fascia supports and receive power from above rather than a raised floor beneath.